$1,428,000
808 El Camino Real Unit E, Burlingame 94010
Size check
The listing's square footage against the county assessor's record and the permits on file.
The listing reports 505 sqft less than the county has on record.
What can explain a difference
- Space built without a permit.
- Permitted work the assessor has not recorded yet.
- An ADU, a finished basement or a converted garage counted in one figure and not the other.
- Different measuring. Listing agents and the assessor often measure the same house differently.
Our Burlingame permit record starts in 2023. Work permitted before then will not appear above.
AddressIntel AI Briefing
This asset presents a condo investment play. Positioned well above market averages at $978 per square foot, immediate capital appreciation is constrained. However, a robust estimated rent of $5,312 per month supports a stable long-term yield portfolio if a discounted entry point can be negotiated.
Property Permit History
| Date | Project Type | Status | Valuation | Contractor |
|---|---|---|---|---|
| 2026-09-24 | RESIDENTIAL ELECTRICAL - OTHER | Issued | $5,500 | FOLEY ELECTRIC INC |
| 2026-04-10 | RESIDENTIAL ALTERATION - RE-ROOF | Finaled | $19,860 | MODERN ROOFING INC |
| 2026-03-18 | RESIDENTIAL ALTERATION - WINDOWS / DOORS | Active | $18,996 | AMERICAN HOME RENEWAL INC |
| 2025-11-10 | RESIDENTIAL ELECTRICAL | Finaled | $986 | IRBIS HVAC INC |
| 2025-10-30 | RESIDENTIAL ALTERATION | Finaled | $9,500 | FINEST GROUP SERVICES |
| 2024-12-04 | RESIDENTIAL REROOF | Finaled | $8,750 | MODERN ROOFING INC |
| 2023-11-07 | RESIDENTIAL MECHANICAL | Finaled | $6,137 | JAZZ HOME SERVICES |
| 2023-06-13 | RESIDENTIAL ALTERATION - REMODEL | Finaled | $650 | OWNER-BUILDER |
| 2023-02-06 | RESIDENTIAL ELECTRICAL | Finaled | $1,050 | LUMISOL INC |
Recent Neighborhood Remodeling (Burlingame)
Parcel & Zoning Info
Condo Investment Snapshot
HOA $583/mo, reduces net rental yield; verify what it covers and reserve health. (from listing description)
Price positioning vs. 70 recent comparable condo/townhome sales in this ZIP. Est. rent is a rule-of-thumb (price ÷ 24 ÷ 12), not a market quote. SB 9 / ADU development analysis doesn't apply to condos: the owner doesn't control the underlying land.
Seller Motivation
Inferred from days on market and listing-description language (e.g. "as-is", "estate sale", "motivated seller"). A screening heuristic for likely negotiability, not a statement about the seller's circumstances.
Hazard Snapshot
Flood Zone
Fire Severity
Liquefaction
Fault Zone
Not a substitute for a Natural Hazard Disclosure (NHD) report. Zones reflect available GIS data and may not cover all localities. Liquefaction and fault flags: modified from California Geological Survey, Web Service of Official Maps of Alquist-Priolo Earthquake Fault Zones and Web Service of Official Maps of Seismic Hazard Zones (2025).
Nearby Public Schools
Washington Elementary
Burlingame Elementary
Crocker Middle
Hillsborough City Elementary
Burlingame High
San Mateo Union High
School boundaries are subject to change. Nearest school distance does not guarantee enrollment eligibility. Check with the local district. Data provided by CDE.
Proprietary Intelligence
Market Heat Index
95/100
Based on recent sales velocity and local demand in 94010.
Flippability Score
20/100
Measures neighborhood renovation density vs. recent permits on this property.
Bidding War Prob.
52%
Likelihood of multiple offers based on local list-to-sale ratios and DOM.
Proforma ROI Calculator
Back-of-the-napkin deal analysis across development strategies.
Median of 3 recent townhome sales in Burlingame (94010): $996/sqft, plus 5% because new houses sold at a median 1.07x their comps across 239 real rebuilds. Sized within 25% of the 2,300 sqft build, because smaller houses sell for more per foot and pricing a rebuild off them overstates resale.
Commission, transfer tax and closing. Deducted from resale before profit, so the ROI below is net of the exit rather than gross.
Interest on the purchase price for the whole project plus half the build budget, since construction draws ramp up. The default is 7% over 33 months, the median purchase-to-sale time of 239 real Peninsula and South Bay rebuilds. Set the rate to 0 for a cash purchase, or use your own lender's terms.
Projected Profit
Warning: Project is mathematically underwater.
Recent Comparables (Burlingame 94010)
Sized to the modelled 2,300 sqft build: sales within 25% of it. Smaller houses sell for more per foot, so pricing a rebuild off them overstates resale.